Summer Schools
Projects (2012)
P A Finlay completed over £800,000 worth of improvement works at five London schools
in under 6 weeks.
Result: over 5,000 children went back to their schools with new facilities at the beginning of
September 2012. |
Cross Keys Homes, Peterborough (2012)
Gunpoint-pumped re-pointing works completed at over 50 houses undertaken in
just 8 weeks.
Fantastic speed and quality work with high levels of resident satisfation. |
London Borough of Newham (2012)
Impressive refurbishment and extension of a small Victorian house to provide new kitchen extension and loft conversion. Property now comprises 4 bedrooms, 2 bathrooms, modern kitchen, energy-saving heating, and insulation.
Another refurbishment to an excellent standard. |
Leadenhall Market,
City of London (2011)
High quality restoration of Grade 1 listed market buildings. Refurbishment of joinery, glazing, stonework, leadwork and ornate decoration and gold leaf work. Included fully enclosed and designed birdcage scaffolding over a fully functioning market.
Completed in time for a grand opening by the Lord Mayor of London. |
London Borough
of Southwark (2012)
King post retaining wall installation at local school. Demolition of existing brick retaining wall (dangerous structure notice) undermined by London Plane trees. Constructed a new 100m augured piled steel RSJ king post piles with reinforced concrete panels. Designed steel detailing, with 4m steel fencing over.
All carried out with the school fully functioning. |